On Friday, my mom and I met with the contractor and construction supervisor. It went well.
We talked kitchen cabinets and made plans for the few uppers and what I want on the lowers. They're going to give me a good deal to use me as a guinea pig on these awesome corner drawers. I'm so excited. I picked out cabinet fronts and they're going to match the finish at Lowe's that I like.
I picked out the tub/shower surrounds. Mark told me today that the solid surround is about $300 more than tile would be in the shower but the same in the bath tub. That's $300 well spent to not have to deal with grout. I still need to pick out the counter top/sink for the hall bath.
We're going to do the same wood floor in the kitchen. That makes me happy. I'm going to put linoleum in the utility room for cheapness and convenience with dogs food and water in there.
We talked about where to look at granite for the kitchen. I'm not sold on granite. I'm not sure why but I'm not. Anyway, I need to go look.
The framing inspection was supposed to be done on March 3rd (2 days ago). I'm not sure if it got done on time or not because of bad weather. After that, it will be insulation and drywall.
I need to call the Container Store and change the delivery address on the closet systems and they can store everything at the warehouse.
They're saying end of April for completion. I hope, hope, hope. I could celebrate 41 in my own home!!!
We talked kitchen cabinets and made plans for the few uppers and what I want on the lowers. They're going to give me a good deal to use me as a guinea pig on these awesome corner drawers. I'm so excited. I picked out cabinet fronts and they're going to match the finish at Lowe's that I like.
I picked out the tub/shower surrounds. Mark told me today that the solid surround is about $300 more than tile would be in the shower but the same in the bath tub. That's $300 well spent to not have to deal with grout. I still need to pick out the counter top/sink for the hall bath.
We're going to do the same wood floor in the kitchen. That makes me happy. I'm going to put linoleum in the utility room for cheapness and convenience with dogs food and water in there.
We talked about where to look at granite for the kitchen. I'm not sold on granite. I'm not sure why but I'm not. Anyway, I need to go look.
The framing inspection was supposed to be done on March 3rd (2 days ago). I'm not sure if it got done on time or not because of bad weather. After that, it will be insulation and drywall.
I need to call the Container Store and change the delivery address on the closet systems and they can store everything at the warehouse.
They're saying end of April for completion. I hope, hope, hope. I could celebrate 41 in my own home!!!
No comments:
Post a Comment